High-capacity EV charging hub & station installation
Alektrify builds EV charging infrastructure end to end — from HT/LT electrical upgrades and transformer foundations to civil canopy work and multi-standard AC/DC charger commissioning. One EPC partner takes a plot or parking area from load sanction to live, revenue-generating bays.
Standard commercial destination sites — workplaces, hotels, retail parks — typically go live in 4–8 weeks. High-capacity fleet depots and public mega-hubs that need dedicated transformers, canopies and multiple 60–120 kW DC fast chargers are commissioned in 8–12 weeks end to end.
The same team that builds the hub operates it afterwards, so every design decision is made for long-term uptime and utilization, not just handover.
- 30 kW – 240 kW DC fast
- HT/LT substation setup
- 4–12 weeks execution

EPC & commissioning
Revenue-ready in weeks
What’s included
HT/LT substation & load sanctioning
Electrical load sanctioning, transformer installation and HT/LT substation setup, coordinated with the utility so the hub has the capacity it needs from day one.
Civil works & canopies
Transformer foundations, civil canopy structures, bay marking, lighting and safe 24/7 access — built for Indian road and grid realities.
Multi-standard charger commissioning
CCS2 dual-gun DC (60–240 kW), Type 2 AC smart chargers (7.4–22 kW) and GB/T & Bharat DC-001 (15–30 kW) — specified per site for passenger EVs, cab fleets, cargo EVs and buses.
OCPP software & network listing
OCPP 1.6J/2.0.1 compliant hardware connected to our command center and listed across major EV apps and OCPI roaming networks at go-live.
How it works
Site evaluation
We assess land or parking, grid connection and expected fleet and public demand, then recommend a bay configuration.
Load sanction & design
Electrical design, transformer sizing and utility applications handled by our team.
EPC execution
Civil, electrical and canopy works executed in 4–12 weeks depending on hub size.
Commissioning & go-live
Every charger is load-tested, connected to the command center and published to drivers and roaming partners.
What you get
- 30 kW – 240 kW DC fast charging capacity
- Go-live in 4–8 weeks for destination sites, 8–12 weeks for mega-hubs
- One partner from load sanction to 24/7 operations
- Hubs designed for 10+ year asset life
Common questions
Standard commercial destination sites (workplaces, hotels, retail parks) typically go live within 4–8 weeks. High-capacity commercial fleet depots and public mega-hubs requiring dedicated HT/LT transformers, civil canopies, and multiple 60 kW–120 kW DC fast chargers are commissioned within 8–12 weeks end-to-end.
Related services
Fleet depot & parking infrastructure
Dedicated commercial EV parking and high-turnaround fleet hubs engineered for continuous 24/7 multi-shift vehicle dispatch.
Learn more24/7 maintenance & operations
Proactive preventive maintenance, on-site rapid-response engineers and remote diagnostics delivering 99.2% SLA-backed uptime.
Learn moreCustom B2B & project deployments
Tailored turnkey CAPEX, OPEX revenue-share and joint-venture project structures for fleet operators, developers and investors.
Learn more