Skip to content
Alektrify
live network

Every hub, every bay, watched live

Alektrify's command center in Gurugram monitors every charger, bay and session across the network around the clock, from the flagship Sector 86 mega-hub to the highway corridors.

Live network

One command center behind every hub

Real-time session telemetry, dynamic load balancing and automated partner revenue settlements stream into a unified command view.

Network load distribution today

41.3 MWh

commercial fleet depots · 52% public fast-charging hubs · 31% workplaces & real estate · 17%

0.0 MWh

energy delivered today

0.0%

SLA-backed uptime

Command center NOC · Gurugram

Every charger heartbeat is monitored via OCPP telemetry with automated breaker reset and instant dispatch of field engineers across Delhi-NCR and partner cities.

DC Bay 04 · Charging 78%

Sector 86 mega-hub, Gurugram · 60 kW CCS2

42.4 kWh delivered · 11 min left

Fleet Lane 02 · Commercial fleet van

Sector 52 depot, Gurugram · 30 kW DC

Contracted fleet SLA · active

Session complete · 18.8 kWh delivered

NH-48 highway corridor · ₹340 settled

Auto-billed via fleet wallet

AC Bay 07 · Charging 64%

Cyber Park workspace, Gurugram · 7.4 kW Type-2

Corporate tenant amenity

DC Fast Lane 01 · Peak session 91%

Dwarka Expressway hub · 120 kW dual-gun

Up to 120 km in 30 min

DC Bay 04 · Charging 78%

Sector 86 mega-hub, Gurugram · 60 kW CCS2

42.4 kWh delivered · 11 min left

Fleet Lane 02 · Commercial fleet van

Sector 52 depot, Gurugram · 30 kW DC

Contracted fleet SLA · active

Session complete · 18.8 kWh delivered

NH-48 highway corridor · ₹340 settled

Auto-billed via fleet wallet

AC Bay 07 · Charging 64%

Cyber Park workspace, Gurugram · 7.4 kW Type-2

Corporate tenant amenity

DC Fast Lane 01 · Peak session 91%

Dwarka Expressway hub · 120 kW dual-gun

Up to 120 km in 30 min

77%

average across the flagship hub’s monitored bays, against a 36-month breakeven target modelled at 72%.

  • 78%

    Bay 01

    60 kW DC

    Active fleet

  • 84%

    Bay 02

    60 kW DC

    Active public

  • 91%

    Bay 03

    120 kW DC

    Highway express

  • 68%

    Bay 04

    30 kW DC

    Cargo EV

  • 74%

    Bay 05

    60 kW DC

    Fleet turnaround

  • 62%

    Bay 06

    22 kW AC

    Overnight bay

  • 79%

    Bay 07

    60 kW DC

    Active fleet

Site blueprint · rev R2

Inside the Sector 86 hub, bay by bay

Drawn from the hub’s engineering layout. Select any charger, bay or panel to see what it does and how power reaches it from the grid.

parking bays in three rows
93
DC fast chargers · 40 CCS2 guns
20
AC slow chargers
100
site footprint
101.5 × 26.1 m
101 50026 063◂ DRIVEWAYDRIVEWAY ▸MeterHTTransformerLTEXITENTRYFC-03

Quick-select a fast charger

Schematic of the engineering drawing “Car parking layout — Sec 86, rev R2”. Positions are indicative.

Power the next wave of India’s EV infrastructure

Whether you are a commercial fleet operator seeking dedicated DC bays, a landowner with prime space, or an investor looking to back high-utilization EV hubs, our Gurugram leadership team will structure a tailored deployment plan.

Partner with us